Our typical projects
2007 09
Participated in the installation of Haoshuiwan 200 MW Hydropower Station
2008 10
Took the lead in completing the construction of 110KV substation in Zhangji Town
2010 05
Completed the power design for the second phase of the Xuzhou Engineering University construction
2011 06
Undertake the urban and rural power grid reconstruction project in Damiao Village, Damiao Town
2015 02
Completed the electricity EPC project of Fangcun Town People’s Hospital in Tongshan District
2017 10
Successfully completed the residential electricity installation of Jinda Garden Community, a real estate development project of Yijun
2018 12
Supplied 24 sets of 400KVA-10/0.4KV oil-immersed transformers for Wushao Town power grid reconstruction project
2019 04
Supplied 4 sets of 315KVA-10/0.4KV oil immersed Distribution transformers for Daishan farmland distribution network transformer replacement project
2019 05
Supplied 3150KVA-10/0.4KV resin cast dry-type transformer to Merida New Material Manufacturing Factory
2020 06
Supplied 1 set of 8MVA-35/10KV oil immersed Power transformer for capacity expansion and transformation PJT at Xiliu primary and secondary stations
2021 02
Supplied 1 set of 20 MVA Power transformer for the Xulian intercity railway substation project
2020 06
Supplied 14 sets of 200KVA-35/0.4KV oil-immersed pole-mounted transformers for Nianzhuang Substation
2021 11
Supplied 4000KVA-10-0.4KV IP23 resin cast coil dry-type Distribution transformer to Dahuangshan Textile Factory
2022 03
Supplied 1 set of 16MVA-35/10KV oil-immersed main Power transformer for Liuxin 35KV substation
2023 07
Supplied medium and low voltage power distribution cabinets and 2500 KVA Dry type transformer for the Liguo Mine power distribution room construction PJT.